
Remodeling services
Keep the shell. Renew everything else.
Five services, one team. Take on one layer at a time, or let us coordinate all of them as a complete remodel.
011–2 weeks
Pool Resurfacing
New plaster, quartz, pebble or glass-bead interiors that feel smooth underfoot and change the color of your water.
View service 021–2 weeks
Waterline Tile & Coping
Fresh waterline tile and new coping: the frame of your pool and the first thing everyone sees.
View service 031–3 weeks depending on size
Pool Deck Remodeling
Travertine, pavers or resurfaced concrete: a deck that stays cool, drains right and looks the part.
View service 041–3 days for most equipment
Equipment & Lighting
Variable-speed pumps, modern filtration, heaters, automation and LED lighting that cost less to run.
View service 053–6 weeks depending on scope
Complete Pool Remodel
Finish, tile, coping, deck and systems under one plan, plus new features like sun shelves, spas and water features.
View service
Where to start
Resurfacing or a complete remodel?
The free on-site assessment answers it for your pool. Here is the rule of thumb.
Resurfacing
1–2 weeks- When it fits
- The structure, tile, coping and deck are sound; the interior is rough, stained or faded.
- What it includes
- Finish removal, repairs, new finish, fittings and start-up.
Complete remodel
3–6 weeks- When it fits
- Several systems are near the end of their life, or the pool no longer fits the home.
- What it includes
- Finish, tile, coping, deck, equipment, lighting and new features, under one design.
How a remodel works
Seven steps. No surprises.
- 01
Day 0 · free
On-site assessment
We inspect the shell, finish, tile, coping, deck, drainage and equipment, take photos and measurements, and listen to how you use the pool. We look for root causes, not just worn surfaces.
- 02
Week 1
Design & itemized proposal
Choose finishes, tile and deck materials with real samples at our Design Center or in our Mobile Showroom at your door. Your proposal is fully itemized, with no hidden costs.
- 03
Before start
Permits & scheduling
We pull the required permits, schedule inspections and lock in a start date. You get one project lead and a clear calendar before anything is drained.
- 04
Days 1–3
Drain & prep
The pool is drained and protected. Old finish, tile and coping come out as scoped, and the surface is prepared down to a sound base so the new work bonds for the long run.
- 05
Days 3–20+
Repairs, tile, coping & deck
Cracks and structure are repaired, then new waterline tile, coping, deck, lighting and equipment go in. Your project lead sends weekly updates with photos.
- 06
1 day
New finish
The interior finish is applied in a single, continuous day by our crew, then cleaned or exposed as the finish requires.
- 07
Final days
Fill, start-up & reveal
We fill the pool, balance the start-up chemistry and walk you through the brushing routine and your new equipment. We don’t consider it complete until you’re genuinely proud of it.
- Resurfacing1–2 weeks
- Tile & coping1–2 weeks
- Deck remodel1–3 weeks
- Complete remodel3–6 weeks
Start your remodel
Let’s give your pool a second life.
Tell us about your pool or property. A remodel specialist will reach out within 24 hours to schedule an on-site assessment.
- Prefer to talk? Call us(239) 330-0335
- Design Center & Showroom2464 Davis Blvd, Naples, FL 34104
- Or we bring the Mobile Showroom, with finish, tile and deck samples, to your door.
Request your complimentary remodel assessment
Tell us about your pool or property and our team will reach out within 24 hours.
Your information is secure and only used to respond to your inquiry.