Skip to content
Crew mixing pool plaster

Our process

Seven steps. No surprises.

You’ll know what happens, who is at your pool and what comes next, from the first visit to the first swim.

  1. 01

    Day 0 · free

    On-site assessment

    We inspect the shell, finish, tile, coping, deck, drainage and equipment, take photos and measurements, and listen to how you use the pool. We look for root causes, not just worn surfaces.

    Your partWalk the pool with us
  2. 02

    Week 1

    Design & itemized proposal

    Choose finishes, tile and deck materials with real samples at our Design Center or in our Mobile Showroom at your door. Your proposal is fully itemized, with no hidden costs.

    Your partPick your finishes
  3. 03

    Before start

    Permits & scheduling

    We pull the required permits, schedule inspections and lock in a start date. You get one project lead and a clear calendar before anything is drained.

    Your partApprove the schedule
  4. 04

    Days 1–3

    Drain & prep

    The pool is drained and protected. Old finish, tile and coping come out as scoped, and the surface is prepared down to a sound base so the new work bonds for the long run.

    Your partNothing, we handle it
  5. 05

    Days 3–20+

    Repairs, tile, coping & deck

    Cracks and structure are repaired, then new waterline tile, coping, deck, lighting and equipment go in. Your project lead sends weekly updates with photos.

    Your partRead your weekly update
  6. 06

    1 day

    New finish

    The interior finish is applied in a single, continuous day by our crew, then cleaned or exposed as the finish requires.

    Your partWatch it come together
  7. 07

    Final days

    Fill, start-up & reveal

    We fill the pool, balance the start-up chemistry and walk you through the brushing routine and your new equipment. We don’t consider it complete until you’re genuinely proud of it.

    Your partSwim

Typical timelines

How long will we be closed?

Every pool is different; you receive your own calendar before we drain.

  • 1–2 weeks

    Resurfacing

  • 1–2 weeks

    Tile & coping

  • 1–3 weeks

    Deck remodel

  • 3–6 weeks

    Complete remodel

How we work

The RL standard, applied to remodels.

  • 01

    Diagnose before we quote

    We look for the root causes of what bothers you about your pool, not just the worn surface, so your budget goes where the transformation will be most visible and most durable.

  • 02

    Every line itemized

    Fully itemized proposals with no hidden costs. You see exactly what is being done, with which materials, and what it costs.

  • 03

    Our own crews, one lead

    In-house craftsmen, a dedicated project lead and weekly updates. You always know who is at your pool and what happens next.

  • 04

    Done when you’re proud

    We don’t consider a project complete until you’re genuinely proud of it. That standard built RL Poolscapes, and it is the one we remodel by.

Start your remodel

Let’s give your pool a second life.

Tell us about your pool or property. A remodel specialist will reach out within 24 hours to schedule an on-site assessment.

Request your complimentary remodel assessment

Tell us about your pool or property and our team will reach out within 24 hours.

Loading form…

Your information is secure and only used to respond to your inquiry.

CallFree estimate